Flowline USB Devices Driver Download For Windows



USB Device Tree Viewer is a small application which interfaces with the Microsot 'USBView' developer tool which provides detailed information about connected USB devices.

Mtp Usb Device Driver Windows 10 free download - MTP Device, USB Mass Storage Device, USB Video Device, and many more programs. Go to Device Manager (right click on My Computer, choose Manage and then find Device Manager in the left panel), or right click on Start Menu for Windows 10 and select Device Manager 3. Right click on the hardware device you wish to update and choose Update Driver Software 4.

Flowline usb devices driver download for windows 8.1Flowline usb devices driver download for windows 8.1

The program, as the name might suggest, features a tree-like view of devices connected. Browsing through USB controllers and connected devices will display a lot of different technical information about the particular device.

Download

USB Device Tree Viewer provides details about connection status, driver description, device ID, power state, address, etc.

Features and highlights

Flowline Usb Devices Driver Download For Windows 7

  • Tree View with handmade 16x16 icons, USBView used 32x32 icons scaled down to 15x15
  • Information from the Windows Device Management are collected and matched with the found USB devices
  • Window position is saved
  • Background color and font of the right pane can be set
  • Text output rearranged
  • Keeps the tree item selection over refresh
  • Some more descriptors are decoded

Flowline USB Devices Driver Download For Windows

USB Device Tree Viewer 3.5.1 on 32-bit and 64-bit PCs

This download is licensed as freeware for the Windows (32-bit and 64-bit) operating system on a laptop or desktop PC from hardware diagnostic software without restrictions. USB Device Tree Viewer 3.5.1 is available to all software users as a free download for Windows.

Flowline Usb Devices Driver Download For Windows 10

Filed under:
  1. USB Device Tree Viewer Download
  2. Freeware Hardware Diagnostic Software
  3. Major release: USB Device Tree Viewer 3.5
  4. USB Controlation Software
  • August 22, 2019 2.9.8

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.9.8

    Released

    August 22, 2019

    Type

    ZIP

    Filesize

    3MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 controller
    • Graphics card with 24 or 32 bit
    • Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Added several internal interfaces for particular sensors (J003).
  • January 25, 2019 2.9.6

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.9.6

    Released

    January 25, 2019

    Type

    ZIP

    Filesize

    3MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 controller
    • Graphics card with 24 or 32 bit
    • Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Added missing Tonemapping Auto property.
  • May 4, 2018 2.9.5

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.9.5

    Released

    May 4, 2018

    Type

    ZIP

    Filesize

    3MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 controller
    • Graphics card with 24 or 32 bit
    • Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Enabled tonemapping for 8bit video formats, e.g. Y800, RGB24 and RGB32.
  • November 21, 2017 2.9.4

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.9.4

    Released

    November 21, 2017

    Type

    ZIP

    Filesize

    3.2MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Repaired not working J003 mono sensor pattern fix on particular video formats.
    2. This driver version is the last that works in Windows XP.
  • January 9, 2017 2.9.3

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.9.3

    Released

    January 9, 2017

    Type

    ZIP

    Filesize

    3.2MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Added a pattern fix for J003 mono sensors.
  • January 9, 2017 2.9.1

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.9.1

    Released

    January 9, 2017

    Type

    ZIP

    Filesize

    3.2MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Fixed the driver signature Code 52 error on new Windows 10 v1607 systems.
  • January 15, 2016 2.8.9

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.8.9

    Released

    January 15, 2016

    Type

    ZIP

    Filesize

    2.3MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Changed certificates so that the driver can also be installed in Vista.
  • November 9, 2015 2.8.7

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.8.7

    Released

    November 9, 2015

    Type

    ZIP

    Filesize

    2.3MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Fixed an error which can appear when using sharpness on older CPUs.
  • October 20, 2015 2.8.5

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.8.5

    Released

    October 20, 2015

    Type

    ZIP

    Filesize

    2.3MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Fixed a bug which can appear on LivePause call.
  • July 15, 2015 2.8.0

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.8.0

    Released

    July 15, 2015

    Type

    ZIP

    Filesize

    2.4MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Support of DFK ECU010-L34 with serial number property.
    2. Added tone mapping.
  • February 17, 2015 2.7.33

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.7.33

    Released

    February 17, 2015

    Type

    ZIP

    Filesize

    2.4MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. The Auto Focus Onepush Running flag now resets correctly after the auto focus has finished.
  • February 5, 2015 2.7.32

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.7.32

    Released

    February 5, 2015

    Type

    ZIP

    Filesize

    2.4MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Video format MJPG (2592x1944) of DFK AFU050-L34 camera can now be used.
  • January 14, 2015 2.7.31

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.7.31

    Released

    January 14, 2015

    Type

    ZIP

    Filesize

    2.3MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Support for IMX236 based cameras.
    2. Support for RGB64 color formats.
    3. Several performance improvements.
  • June 6, 2014 2.7.9.1152

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.7.9.1152

    Released

    June 6, 2014

    Type

    ZIP

    Filesize

    2.1MB

    Requirements

    • Intel Core i3 or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit), Windows 10 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Added new properties: Brightness, sharpness, de-noise, saturation, hue and contrast.
    2. Added new property: Highlight reduction.
    3. Added new property: White balance temperature controls.
    4. Pixelfix for Y16 cameras now works as expected.
    5. VideoControl_ExternalTrigger (DirectShow property) can now be set as expected.
  • January 1, 2014 2.6.5.1014

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.6.5.1014

    Released

    January 1, 2014

    Type

    ZIP

    Filesize

    1.9MB

    Requirements

    • Intel Pentium IV or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. Fixed missing auto-gain for DFK AFU130.
    2. Fixed focus when start value is out of auto_focus_range.
    3. Fixed problem with AUTOFOCUS_ROI_RIGHT: minimum possibly wrong.
    4. Fixed auto focus ROI not working for 21*UC cameras.
    5. Fixed crash on load/connect with certain cameras 22/72xUC.
    6. Fixed previous exposure settings not being loaded on reconnect.
    7. Complete reworking of internal property system.
    8. Fixed Windows XP driver load crash.
    9. Fixed drop counter to be accessible from DirectShow.
    10. Fixed Windows 8 problem with certain video formats needing converters with standard DirectShow filters (e.g. Y800, capturing to an Y800 avi file was not possible).
    11. Fixed a problem with Windows 8 usbxhci driver not allowing transfers larger then 4 MB.
  • February 26, 2013 2.4.14.851

    Device driver for all The Imaging Source USB cameras except the 33U, 37U, 38U and AFU auto focus series.

    Version

    2.4.14.851

    Released

    February 26, 2013

    Type

    ZIP

    Filesize

    1.9MB

    Requirements

    • Intel Pentium IV or similar, 2 GB RAM
    • USB 3.0 or USB 2.0 controller (depends upon camera model)
    • Graphics card with 24 or 32 bit
    • Windows XP, Windows Vista, Windows 7 (32 & 64 bit), Windows 8 (32 & 64 bit)
    • DirectX 9.0c or higher

    Changelog

    1. WHQL certification.